Large-Capacity Tank Project
- Year
- 2002
- Location
- Cartagena, Spain
- Status
- Completed
- Sector
- Industrial / Storage Infrastructure
- Scope
- Technical project for a 1,000 m³ storage tank
Description
Technical project for the integration of a 1,000 m³ industrial storage tank in Cartagena. The documentation covered foundations design, retention bund sizing, anchoring details, pipe-rack interfaces and the civil works required to install the vessel into the existing industrial environment. Calculations and drawings were produced to construction level and aligned with the applicable Spanish industrial pressure-equipment and storage regulations. The intervention required precise coordination with the plant's existing utilities, traffic and safety distances to ensure the new vessel could operate alongside the active facility from day one. The project demonstrates the practice's experience handling large-scale industrial storage infrastructure with the technical rigour required by the petrochemical and industrial-gas sectors.
Project Brief
2002 · Cartagena, SpainOverview
Civil and technical project to integrate a 1,000 m³ industrial storage tank into an existing facility in Cartagena.
Scope of Work
- 01Foundations design and structural calculations
- 02Retention bund sizing and safety distances
- 03Anchoring and pipe-rack interface details
- 04Coordination with existing utilities
- 05Compliance with Spanish storage regulations
Approach
Civil documentation produced under industrial storage regulations, coordinated with existing utilities and traffic so the vessel could operate from commissioning.
Outcome
A 1,000 m³ tank installation fully integrated into the active industrial environment with construction-ready documentation.
Visual documentation — archival project, photographic record not publicly available.